CORDIAL BHARATHI

Nanthencode, Trivandrum

The super luxury apartment project is located at the nerve centre of the city- Nanthencode. The highlight of the project is its nearness of all major landmarks in Trivandrum like Museum, Kowdiar Palace etc. prominent educational institutions, shopping centres, tourist spot etc. are situated within close radius. Cordial Bharathi there by provides convenience and accessibility and is located in the heart of the city. At cordial Bharathi you can experience luxury at the prime and enjoy all modern amenities including infinity pool on the top most floor of the building. The apartment project comprised of basement, ground + 19 upper floors.

  • GENERAL
    Elegant A/C lobby and reception area
    Video door phone connectivity in each apartment with main entry / Security point
    Infinity swimming pool
    Home Theatre
    Terrace party area
    Sauna bath
    Fitness centre with most modern equipment
    A/C multipurpose hall
    Servant Toilet in all floors
    Wooden flooring in Master bed room
    Split A/C in Master bed room and provision for split A/C in all other bedrooms and living
    Fully furnished air conditioned guest suites
    Provision for Internet connectivity for each apartment
    Reading room and provision for reference library
    Intercom facility
    Children`s play area
    Provision for Cable TV connection in each apartment
    Individual Letter box and name board
    Generator back - up for lifts, water pumps, common lighting and designated points in each apartment.
    Arrangements for Reticulated gas supply system
    Security alarm
    Sewage treatment system
    Provision for security (Security Cabin)
    Water supply system through sump and over head tank
    Changing room for drivers and servants
    Toilets for drivers and servants
    Common car wash facility
    Automatic gate control system for entry / exit
    Solar assisted lighting in designated points of common areas
    Individual water meter for each apartment.
    Elegant shopping area in Ground and First floor
    CCTV surveillance
  • Specification
    Structure
    RCC framed structure designed for higher seismic consideration with pile foundation

    Flooring
    Superior quality Granite flooring in entrance lobby. Wooden flooring in master bedroom.Elegant Vitrified tiles(80cmx80cm or nearest size) for the remaining area, except toilets and staircase. Kitchen with granite flooring

    Painting
    Premium quality putty finish with plastic emulsion for internal walls & ceilings. Balcony handrails painting with epoxy enamel paint. Outside walls painting with superior quality weather shield paint.

    Cornice
    PVC Cornice in living and dining.

    Toilets
    Premium quality anti-skid ceramic tiles for the floor and modern glazed tiles for wall up to door height. Geyser provision and health faucet in all toilets except in servant`s toilet. Oval washbasin of superior brand and premium colour. Granite counter top washbasin in toilets.

    Sanitary ware & CP fittings
    Branded sanitary fixtures matching with tiles, wall mount closet of Roca/American Standards or equivalent type with concealed flushing cistern. CP fitting of `Jaquar` or equivalent type

    Kitchen & Work Area
    Counter with granite top and double bowl/ single bowl stainless steel sink in kitchen. Glazed tiles above the counter to a height of 40cms. Single bowl sink with granite top in work area. Provision for water purifier and dish washer.

    Doors
    Polished teak wood frame and shutter for entrance door and moulded shutters for internal doors with hard wood frames. Hardwood frames with treated flush door of one side resin coating for toilets. Internal doors and frames painted with superior quality synthetic enamel paint.

    Windows
    Powder coated aluminium frame with glazed sliding shutters and MS safety grills.

    Electrical
    All wiring with superior quality copper wires inside apartments including PVC conduits of ISI standards. Power plugs with adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB meter. Branded modular switches of Legrand or equivalent quality. Provision for Washing machine, Fridge etc. and provision for internet connection in one bed room.

    Generator
    Generator backup for elevators, water pumps and designated points in each apartment and common area light points.

    Elevators
    Three fully automatic elevators including one bed type.

    Cable TV
    Provision for cable TV connection in Living and master bedroom (subject to then prevailing Government rules).

    Telephone
    Wiring for telephone in Living and Master bedroom.

    Water supply
    Water supply arrangements through sump and overhead tank.

    Air-Conditioning
    Split AC in master bed room. Wired provision in other bedrooms and living.

    Fire safety
    Fire protection systems as per rules.

    Car parking
    Covered car parking (at extra cost).Flooring with exterior grade paving tiles/cobbles.

    Staircase
    Flooring with vitrified rustic tiles and hand rails in stainless steel.
    Balcony
    Flooring with anti-skid ceramic tiles and MS balusters with GI top rail.
  • Location Map
    Location Map- Cordial Bharathi

NOVEMBER 2017

  04 Nov 2017

1 Basement floor roof slab to terrace floor slab concreting Completed
2 Lift machine room floor slab concreting Completed
3 Lift machine room floor column concreting Completed
4 Over head water tank concreting In progress
5 Block work of all apartments up to thirteenth floor Completed
6 Block work for A & D apartments up to eighteenth floor Completed
7 Ceiling plastering for A & D apartments up to eighteenth floor Completed
8 Ceiling plastering for B & C apartments up to fourteenth floor Completed
9 Inside wall plastering up to ninenth floor Completed
10 External wall plastering up to eleventh floor Completed
11 GI wire pulling up to fourteenth floor for B & C apartments Completed
12 GI wire pulling up to eighteenth floor for A & D apartments Completed
13 Sample apartment works 50% completed
14 Electrical wall chasing up to twelfth floor Completed
15 Door frame fixing up to eleventh floor Completed
16 Plumbing works up to seventh floor 30% completed
17 Fire fighting works up to seventh floor Completed

01.07.2017

  01 Jul 2017

1 Basement floor roof slab to Seventeenth floor slab concreting Completed
2 Seventeenth floor column concreting Completed
3 Eighteenth floor slab concreting 50% completed
4 Block work up to eleventh floor Completed
5 Ceiling plastering up to twelfth floor In progress
6 Inside wall plastering of seventh to fifth floor Completed
7 External wall plastering from tenth to second floor A,B & C apartments Completed
8 GI wire pulling up to thirteenth floor Completed
9 Sample apartment works 50% completed
10 Electrical wall chasing from seventh floor to third floor Completed

05.05.2017

  11 May 2017

1 Basement floor roof slab to fourteenth floor slab concreting Completed
2 Fourteenth floor column concreting Completed
3 Fifteenth floor slab concreting 50% completed
4 Block work up to tenth floor Completed
5 Ceiling plastering up to eleventh floor Completed
6 Inside wall plastering of tenth to sixth floor Completed
7 External wall plastering from tenth to second floor A apartment Completed
8 GI wire pulling up to eleventh floor Completed
9 Sample apartment works 50% completed
10 Electrical wall chasing from seventh floor to sixth floor Completed

05.04.2017

  05 Apr 2017

Basement floor roof slab to thirteenth floor slab concreting Completed
Thirteenth floor column concreting 50% completed
Block work in eighth floor Completed
Ceiling plastering up to ninenth floor Completed
Inside wall plastering of sixth & seventh floor Completed
External wall plastering In Progress
GI wire pulling up to ninenth floor Completed
Sample apartment works 50% completed

Work Status As On 05.03.2017

  05 Mar 2017

1 Basement floor roof slab to eleventh floor slab concreting Completed
2 Eleventh floor column concreting Completed
3 Twelfth floor slab concreting 50% completed
4 Twelfth floor slab shuttering & reinforcement laying works (second portion) In Progress
5 Block work in seventh floor Completed
6 Ceiling plastering up to eighth floor Completed
7 GI wire pulling up to seventh floor Completed
8 Sample apartment works In Progress

Work Status As On 05.02.2017

  05 Feb 2017

1 Basement floor roof slab to nineth floor slab concreting Completed
2 Nineth floor column concreting Completed
3 Block work in fifth floor Completed
4 Sixth floor block work In Progress
5 Ceiling plastering up to seventh floor Completed
6 GI wire pulling up to seventh floor Completed
7 Tenth floor slab concreting 50% completed
8 Eleventh floor slab shuttering & reinforcement laying works In Progress

04.01.2017

  04 Jan 2017

1 Basement floor roof slab to eighth floor slab concreting Completed
2 Eighth floor column concreting Completed
3 Block work in third floor Completed
4 Fourth floor block work In Progress
5 Ceiling plastering up to fourth floor Completed
6 Sump Tank works Completed
7 GI wire pulling up to fifth floor Completed
8 Ninenth floor slab shuttering & reinforcement laying works In Progress

December

  06 Dec 2016

1 Basement floor roof slab to seventh floor slab concreting Completed
2 Basement floor retaining wall water proofing works Completed
3 Eighth floor slab concreting 50% completed
4 Block work in Second floor Completed
5 Third floor block work In Progress
6 Ceiling plastering up to third floor Completed
7 Sump Tank works 90% completed
8 Electrical wire pulling up to fourth floor Completed

01.11.2016

  01 Nov 2016

1 Basement floor roof slab Completed
2 First floor slab Completed
3 Ground floor retaining wall work Completed
4 Second floor slab Completed
5 Third floor slab concreting Completed
6 Fourth floor slab concreting Completed
7 Basement floor retaining wall water proofing works 70% completed
8 Fifth floor slab concreting Completed
9 Sixth floor slab concreting Completed
10 Second floor ceiling plastering preparation works Completed
11 Seventh floor slab concreting 50% completed
12 Third floor ceiling plastering preparation works In Progress
13 Sump Tank works In Progress

01.11.2016

  01 Nov 2016

1 Basement floor roof slab Completed
2 First floor slab Completed
3 Ground floor retaining wall work Completed
4 Second floor slab Completed
5 Third floor slab concreting Completed
6 Fourth floor slab concreting Completed
7 Basement floor retaining wall water proofing works 70% completed
8 Fifth floor slab concreting Completed
9 Sixth floor slab concreting Completed
10 Second floor ceiling plastering preparation works Completed
11 Seventh floor slab concreting 50% completed
12 Third floor ceiling plastering preparation works In Progress
13 Sump Tank works In Progress

01.11.2016

  01 Nov 2016

1 Basement floor roof slab Completed
2 First floor slab Completed
3 Ground floor retaining wall work Completed
4 Second floor slab Completed
5 Third floor slab concreting Completed
6 Fourth floor slab concreting Completed
7 Basement floor retaining wall water proofing works 70% completed
8 Fifth floor slab concreting Completed
9 Sixth floor slab concreting Completed
10 Second floor ceiling plastering preparation works Completed
11 Seventh floor slab concreting 50% completed
12 Third floor ceiling plastering preparation works In Progress
13 Sump Tank works In Progress

01.11.2016

  01 Nov 2016

1 Basement floor roof slab Completed
2 First floor slab Completed
3 Ground floor retaining wall work Completed
4 Second floor slab Completed
5 Third floor slab concreting Completed
6 Fourth floor slab concreting Completed
7 Basement floor retaining wall water proofing works 70% completed
8 Fifth floor slab concreting Completed
9 Sixth floor slab concreting Completed
10 Second floor ceiling plastering preparation works Completed
11 Seventh floor slab concreting 50% completed
12 Third floor ceiling plastering preparation works In Progress
13 Sump Tank works In Progress

01.11.2016

  01 Nov 2016

1 Basement floor roof slab Completed
2 First floor slab Completed
3 Ground floor retaining wall work Completed
4 Second floor slab Completed
5 Third floor slab concreting Completed
6 Fourth floor slab concreting Completed
7 Basement floor retaining wall water proofing works 70% completed
8 Fifth floor slab concreting Completed
9 Sixth floor slab concreting Completed
10 Second floor ceiling plastering preparation works Completed
11 Seventh floor slab concreting 50% completed
12 Third floor ceiling plastering preparation works In Progress
13 Sump Tank works In Progress

CORDIAL BHARATHI_1.jpg

JUNE 2016

  09 Aug 2016

# Work description Current Status
1 Column concreting basement floor - Completed
2 Retaining wall work, basement floor - Completed
3 Basement floor roof slab - Completed
4 Ramp slab (basement to ground floor) and ground floor columns - Completed
5 First floor slab - Completed
6 Ground floor retaining wall work - Completed
7 Column concreting in first floor - Completed
8 Ground to first floor ramp slab - Completed
9 First floor lift & stair work - Completed
10 Second floor slab - 80% completed
11 Third floor column casting - In progress

MAY

  02 May 2016

1 Piling work Completed
2 Pile cap concreting Completed
3 Column concreting Ground floor Completed
4 Retaining wall work, basement floor Completed
5 Basement floor roof slab Completed
6 Ramp slab (ground to first floor) Completed
7 First floor slab shuttering & reinforcement laying (60%) Completed
8 Ground floor retaining wall work (90%) Completed
9 Column concreting ground floor (80%) Completed
10 Ground to first floor ramp Completed
11 First floor lift & stair work In progress
12 Second floor shuttering work In progress
13 First floor column casting ( 40%) completed.

MARCH

  25 Mar 2016

1 Piling work Completed
2 Pile cap concreting Completed
3 Column concreting cellar floor Completed
4 Retaining wall work, basement floor (95%) Completed
5 Basement floor roof slab (75%) Completed
6 Ramp slab (basement to ground) Completed
7 Basement floor roof slab shuttering & reinforcement laying (85%) Completed
8 First floor slab shuttering & reinforcement laying (40%) Completed
9 Ground floor retaining wall work (60%) Completed
10 Column concreting ground floor (80%) Completed
11 Ground to first floor ramp Completed
12 Ground floor lift & stair work Completed

25.01.2016

  25 Jan 2016

1 Piling work Completed
2 Pile cap concreting (95%) Completed
3 Column concreting cellar floor (90%) Completed
4 Retaining wall work, basement floor (75%) Completed
5 Basement floor roof slab (33%) Completed
6 Ramp slab (basement to ground) Completed
7 Basement floor roof slab shuttering & reinforcement laying (50%) along with front & rear drive way slab Completed
8 First floor slab shuttering & reinforcement laying In Progress
9 Ground floor retaining wall work In Progress
10 Column concreting ground floor (40%) Completed

DECEMBER

  29 Dec 2015

Piling work completed.
Pile cap concreting nearing completion.
Column concreting ground floor, 75% completed.
Retaining wall work basement floor, 75% completed.
Basement floor roof slab, ramp slab shuttering and reinforcement laying in progress.

28.10.2015

  28 Oct 2015

Piling work completed.
Pile cap concreting nearing completion.
Column concreting ground floor in progress.

26.09.15

  26 Sep 2015

Piling work is nearing completion.
Pile cap concreting in progress.
Column concreting in progress.

Work Status

  04 Sep 2015

1) piling work is nearing completion
2) pile cap concreting in progress

22.07.2015

  22 Jul 2015

piling work is nearing completion

CORDIAL BHARATHI_1.jpg

June

  10 Jul 2015

pilling work in fast progressing

24-04-2015

  27 Apr 2015

*Piling work fast progressing

24 Dec

  24 Dec 2014

Earth work nearing completion