Cordial Corona

Nanthencode, Trivandrum

A Super Luxuary Apartment Project,At Nanthencode, Trivandrum extending the finest experience of Cordial living.
It is elegance and luxuary that occupy the maximum space in Cordial Corona.At Nanthencode,with equal distance of less than 500 mtrs from Raj Bhavan, Museum and PMG jn., Cordial Corona settles itself in a Peaceful and serene ambience. Surrounded by the facilities of a metro city, the life in Cordial Corona beckons all comforts at your command.

  • Amenities
    Elegent air-conditioned lobby with automatic sensor entry and reception area.
    Video door phone connectivity with main entry / security point.
    Swimming pool.
    Terrace party area.
    Fully furnished air conditioned guest suites.
    Split AC in master bed room.
    Wooden flooring in master bedroom.
    Internet connectivity for each apartment.
    Fitness centre with most mordern equipment.
    Sauna.
    Meditation space.
    Air-conditioned multi purpose hall.
    Reading room and provision for reference library.
    Intercom facility.
    Children`s play area ( indoor & outdoor ).
    Cable TV connection in each apartment.
    Individual letter box and name board.
    Generator back up for lifts, waterpumps,common lighting and designated points in each apartment.
    Retriculated gas supply system.
    Security alarm.
    Sewage treatment plant.
    Provision for 24 hours security.
    24 hrs water supply & electricity.
    Changing room for drivers & servants.
    Toilets for drivers & servents.
  • Flooring
    Wooden flooring for master bedroom.
    Vitrified tiles for the remaining area, except toilets.
    Painting
    Putty with acrylic distemper for internal walls & ceiling. Cornice in foyer,living & dining. Painted finish for doors.
    Toilets
    Anti skid ceramic tiles for floor and glazed tiles for wall upto door height. Sanitary fixtures matching with tiles, wall mounted EWC with concealed flush tank, geycer provition iand health faucet in all toilets except servant`s toilet.
    Kitchen & Work area
    Counter with granite top & stainless steel sink. Glazed tiles above the counter to a height of 45 cms. Single bowl sink with granite top in work area.
    Doors
    Polished teakwood entrance door & moulded internal doors. Hardwood frames with wooden paneldoors for toilet.
    Windows
    Aluminium powder coated with glazed shutters & safety grills.
    Electrical
    All wiring with power plugs. Adequate light & fan points.Points controlled by ELCB & MCB with independent KSEB metre. Modular switchews.
    Generator
    Generator backup for Elevators, common lighting, waterpumps & designated points in each apartment.
    Elevators
    4 numbers - fully automatic ( including bed ) elevators.
    Cable TV
    Connection in living & master bedroom ( subject to prevailing govt.rules )
    Telephone
    Wiring for telephone in living & master bedroom.
    Water supply
    Water supply through sump and overhead tank.
    Air Conditioning
    Split AC in master bedroom. Provision in other bedrooms.
    Fire safety
    Fire protection system as per rules.
    Car parking
    Covered car parking ( at extra cost )
  • Location Map
    Locatiom map
elevation.jpg

Work Status

  24 Mar 2023

SLAB:- Structure completed.
Block work:- Completed
Wall Plastering:- Completed

Electrical work:-
Wall chasing completed
Wire pulling completed
Plug and switch fixing completed.
Electrical fittings till 7th floor lobby completed

Painting:-
1st coat painting completed in 35 apartments.
2nd coat painting completed in 6 apartments.
Outside primer work completed.
Out side texture work completed
Light well primer work and texture work completed.
Out side painting 95 % completed

Plumbing:-
Concealed work completed
Suspension work completed
Duct work completed and checking completed.
CP & Sanitary fittings 60% completed

Tile:- Completed

Water Proofing:- Completed

AC work:- Work completed
1. Lift cladding work completed
2. Lift 1, 2 & 4 working
3. Recreation area tiling completed.
4. Grill fixing 100% completed
5. Aluminum window and ventilator work 95% completed
6. Sliding door completed
7. Duct door fixing 95% completed
8. Wooden flooring 80% completed.
9. Ramp formation and retaining wall work completed.
10. Septic tank work completed.
11. Parking area tile work completed
12. Entrance gate work painting ongoing