Project Details

Cordial Casilda

Ulloor, Trivandrum

Cordial Casilda is one of the popular Residential Developments in Ulloor neighborhood of Trivandrum. It is among the Ongoing Projects of Cordial Developers and Builders Pvt Ltd. The landscape is beautiful with spacious Houses. Very close to Govt: Medical College, Trivandrum. Project on the side of National Highway 47 at ULLOOR on the way to Govt.Enginering College & Techno Park. Super Luxury Apartment with all modern amenities.

  • General
    Elegant A/C lobby with automatic sensor entry and Reception area
    Elegant A/C lobby with automatic sensor entry and Reception area
    Video door phone connectivity with main entry/Security point
    Roof top swimming pool
    Terrace party area
    Fully furnished air-conditioned guest suites
    Split A/C in master bedroom
    Wooden flooring in master bedroom
    Internet connectivity for each apartment
    Fitness centre with most modern equipment
    Sauna
    Meditation space
    Billiards
    A/C Multy - purpose hall
    Reading room and provision for reference library
    Intercom facility
    Children`s play area (Indoor & Outdoor)
    Cable T V connection in each apartment
    Individual letter box and name board
    Generator Back -up for lifts water pumps, Common lighting and designated points in each apartment
    Reticulated gas supply system
    Security alarm
    Sewage treatment system
    Provision for 24 hrs security
    24 hrs water supply system through sump and over head tank
    Changing room for drivers & servants
    Toilets for drivers and servants
    Common car wash Facility in car parking area
    Automatic control system for car parking
    Both side Entry/Exit
  • Flooring
    Superior quality Granite flooring in Entrance lobby. Wooden flooring in master bedroom. Elegant Vitrified tiles for the remaining area accept toilets
    Structure
    RCC Framed structure designed for higher seismic consideration with pile foundation.
    Kitchen and Work area
    Counter with granite top and double bowl stainless, still sink in kitchen. Glazed tiles above the counter to a height of 45-cms. Single bowl sink with granite top in work area. Provision for water purifier and dish washer.
    Doors
    Polished teakwood frame and shutter for entrance door and moulded shutters for internal doors with hard wood frames. Hardwood frames with paneled wooden doors for toilets.
    Windows
    Powder coated Aluminum frame with glazed shutters and Ms safety grills.
    Electrical
    All wiring with superior quality copper wires including PVC conduits of ISI standards. Power plugs with adequate light and fan points. Points controlled by ELCB and MCB with independent KSEB metre. Branded Modular switches of legrand or equivalent quality. Provision for Washing Machine, fridge etc and provision for internet connection in one bed room.
    Generator
    Generator backup for elevators, common lighting, water pumps and designated points in each apartment.
    Water supply
    Water supply arrangements through sump and overhead tank.
    Air Conditioning
    Split AC in Master bedroom. Wired provision in other bedrooms and living.
    Fire safety
    Fire protection systems as per rules
    Car parking
    Covered car parking (at extra cost).
    Elevators
    Three Numbers fully automatic elevators including one bed type.
    Cable TV
    Connection in living and Master bedroom (subject to prevailing Government rules)
    Comice
    Comice in foyer, living, dining & master bed room.
    Toilets
    Premium quality anti skid ceramic tiles for the floor and glazed tiles for wall up to door, height. Geyser provision and health faucet in all toilets except savant`s toilet.
    Sanitary ware and CP fittings
    Branded sanitary fixtures matching with tiles, wall mount closet of American Standard` or equivalent type with concealed flushing system. CP fittings of `Jaquar` or equivalent type.
    Telephone
    Wiring For Telephone In Living And Master Bedroom.
  • Location Map
    location
view06.jpg

Latest Report

  03 Jan 2014

Foundation completed
superstructure completed
masonry completed
plumbing complete
flooring 90%completed
electricfication completed
generator setup completed
putty work 1st and final coat completed
painting - interior first coat commenced
exterior painting first coat+ primer completed
lift installation - bed lift completed
- other 2 lift 60% completed